We can make as many repairs as we want in our home, rearranging furniture and household appliances.However, such a conversion as moving a gas boiler in a private house can cause certain problems with the gas service. In addition, disagreements will certainly arise with the local authorities of the city/town/district, which will be resolved in court.
Agree, it’s better to foresee everything and make it official than to then wander around the courts, pay fines and change everything back. But how to carry out the transfer correctly - with minimal loss of time and damage to nerves?
We will tell you everything about this difficult procedure. Let's look at whether it is even possible to move gas equipment in suburban private property and in a city apartment. We will tell you where and with whom to coordinate the reconstruction, as well as what documents need to be collected.
The content of the article:
Relocation of the boiler from a regulatory point of view
Internal gasification project is a document containing detailed schematic information on the floor plan of a residential building with identification of technical points for the location of gas-using equipment on a scale of 1:100.
That is, moving a gas-fired heat generator to another location is a violation of the design documentation and requires changes to it.
Let's figure out whether it is possible to move a gas boiler to another place? And if it is possible, then by what regulatory documents is this approved and where is it recorded?
The “housing issue” regarding the transfer of a gas boiler and other equipment in an apartment is determined by a number of articles of the Housing Code (Housing Code) numbered 25-29. And this process is called reorganization. The regulatory collection contains detailed information on the approval of the procedure, possible refusal and its protest, the consequences of unauthorized transfer, and so on.
The specified articles of the code of housing standards apply specifically to the premises of multi-apartment buildings, i.e. regulate measures and standards for moving gas pipes, meters, boilers within apartments. However, this does not mean that no rules apply to private houses.
According to the resolution of the State Construction Committee of the Russian Federation dated September 27, 2003, clause 1.7., only after obtaining permission is it possible to carry out the refurbishment of premises for any purpose. In this case, the transfer of gas appliances falls under this definition.
Moreover, self-installation and gas heat generator replacement is not prohibited, but its admission into operation and connection must be carried out by employees of the gas supply company with the appropriate license.
In addition, the transfer of gas distribution will have to be approved, meter and other gas equipment at home. For uncoordinated actions, you may be required to return all gas equipment to its original location. In this case, you will have to pay considerable fines for each of the moved devices, even after reinstallation.
Administrative liability for unauthorized transfer of a boiler is determined according to the type and severity of the violation.There are penalties, obligations to return devices to their original location, and even shutdown of gas supply. It is almost impossible to challenge the sanctions in court, because you will in fact violate the requirements of the housing code.
The punishment is justified, because unprofessional installation of equipment, as well as changes in the design, are a gross disregard of fire safety requirements, a threat to the life and health of people living in the building, and a violation of the gas supply engineering scheme.
How to arrange the transfer of a boiler in a private house?
Coordination on the movement of gas-using equipment and gas distribution is carried out with representatives of the resource supply organization. The application is filled out according to the form approved by Decree of the Government of the Russian Federation No. 266.
When visiting the gas service, you should have a package of the following documents with you:
- Passport of the applicant (owner of the residential premises).
- Home gas supply project.
- Technical passport for residential premises.
- Passport for a gas-using device.
- Consent of all other homeowners, if the house is in shared ownership (representative of the interests of minor owners).
The exact list of documents should be clarified in advance during a call or visit.
You will receive the commission's decision on a separate form by mail or in person.
In practice, failures practically never happen. They can only be associated with the non-compliance of the new boiler room with established standards and the lack of documents for the facility confirming the rights of the owner. Gas workers don’t care how many times and where you move the boiler.
If you want to speed up and simplify the procedure, try using the services of a gas service that offers to perform all types of work on a turnkey basis. Some organizations provide a similar service and all you need to do is write an application and conclude an agreement.
Representatives of the company will come to the site, draw up protocols for the replacement and transfer of all required equipment, carry out coordination and installation work from installation and grounding of a gas boiler before its launch and configuration.
Important points for moving the boiler
First of all, please note that transfer is only possible to an officially registered premises. That is, you will not be allowed to use recently constructed extensions that are not technically present in the house as a boiler room.
If you are moving a boiler with a design change, be prepared that you will have to do so under the new SP that came into force in July 2019. Regulatory acts of 1989, 2003, 2011 are invalid.
SP 402.1325800.2018 “Residential buildings.Rules for the design of gas consumption systems" differs slightly from the old standards and at the same time is mandatory for use according to the order of the Ministry of Construction.
Let's consider the main nuances of gas design, taking into account old and new rules:
- The room into which you are moving the boiler must be non-residential and included in the house plan.
- The ceiling height in a room with a boiler with an open combustion chamber must be at least 2.2 m.
- The volume of the room (kitchen, kitchen-dining room, corridor) with a gas stove must be at least 8 cubic meters for an appliance with 2 burners, each subsequent burner increases the volume by 3 cubic meters. meters.
- The room with a gas stove and a heat generator with an open combustion chamber must be at least 6 cubic meters. meters more than in point No. 3, but not less than 15 cubic meters. meters.
- The heat generator can be installed in the basement or basement, but it is prohibited to place it in the bathroom and sanitary facilities.
- It is necessary to equip a natural exhaust with three air changes per hour, and the influx should be in the volume of the exhaust + combustion air. For accurate calculations, technical calculations are carried out.
- In kitchen-dining rooms, exhaust ducts are provided with one air exchange per hour + 100 cubic meters. meters.
- The door to the room opens outwards
- The socket for volatile boilers should be located no further than 0.5 m from the device
You will also find other important nuances that may be useful to you when moving the boiler in SP 62.13330.2011 and SP 402.1325800.2018.
Complying with the rules is quite difficult in terms of constructive arrangement. If you are just building a new boiler room, take into account the entire list of requirements while designing the room.
How much does it cost to move a gas boiler?
It is difficult to answer how much it will cost you to move a gas boiler to another location.
This depends on many factors:
- Transit distance.
- Replacement of shut-off and control valves, supply hoses.
- Possibility and necessity of transferring other equipment.
- Replacing or making changes to the project.
- Difficulty completing the task.
- Local price list for similar types of services.
Before implementing your plans, it is best to calculate everything and make sure of your financial capabilities. It is also worth rounding the resulting figure, since unexpected expenses may arise in the process. On average, the final estimate starts at least 8 thousand rubles, but the figure can be many times higher.
How is equipment transferred?
The procedure for changing the installation location is not as complicated as it might seem. You take the package of documents to the local branch of the GorGaz company and write an application. In this case, it is important to indicate the new installation location, specifying the dimensions and other features. The easiest way is to use the registration certificate at home.
Gas workers come to you and draw up project documentation for the transfer, one copy of which is given to the owner of the house for review.
Next comes the transfer of the heating system complex and gas distribution, and then the starting start of the heat generator. If everything goes well, the contractors draw up an act according to which the owner of the house goes to the gas organization to register the installation activities carried out.
To ensure that all work is completed faster, first prepare the place for installing the boiler if you are sure that it meets all the standards.
You will need:
- Remove flammable items from the room.
- Rehang the door if it previously opened inward.
- Install the outlet in accordance with regulations.
- Place gas and water pipes, as well as electrical wires, to the places required by regulations.
- Hang a shield made of non-combustible material at the installation site of the wall-mounted boiler and attach brackets to form a flat base for the floor-standing unit that complies with fire safety standards.
- Make a hole for the chimney.
Finally, you will need to check the exhaust openings and make sure that the passage to the unit installed in the new location is clear.
Free space around the gas boiler is necessary for you to control the equipment personally, as well as for technical inspections and maintenance by employees of the company with which you have a relationship. contract signed for monitoring the condition of the device and supplying blue fuel.
Conclusions and useful video on the topic
Video: What are the dangers of installing gas equipment:
Moving gas equipment to a more convenient location in a private home is a complex procedure, but quite feasible.However, it is strictly not recommended to carry it out without the approval and services of the gas company. If you complete everything correctly and save the received work certificates, you will not have any problems with supervisory structures.
Would you like to talk about how you received permission to move a gas unit into your house/apartment? Do you have useful information on the topic of the article? Please write comments in the block below, share valuable information, ask questions.
Is permission required to move a gas boiler in the same premises?
Good day . Private house, what is needed to change a parapet boiler to a wall-mounted one with a closed combustion chamber? We would like to move the boiler into the kitchen altogether, is this possible? Thank you.
Hello, this is a question
During her lifetime, my grandmother remodeled a gas pipe to a new location, she lived alone, we didn’t know anything about business, she didn’t have time to formalize anything, she died
Now we are entering into inheritance rights, is it possible to legitimize the already converted pipe and formalize everything and do it or redo it as it was? In principle, the pipe goes the same way only from the back side of the wall