Connecting gas in an apartment: procedure and rules for connecting gas in apartment buildings

If you are the happy owner of an apartment in a new building, then soon you will have to deal with the procedure for connecting gas to your new home. Agree, it is better to understand the issue in advance in order to be fully prepared for all possible difficulties.

In this case, connecting gas to an apartment is somewhat different from gasifying a private house, since apartment buildings are managed by a group of people - apartment owners, whose consent is required to connect the building to the central gas pipeline.

To be able to use gas, the apartment owner will need to fully prepare the premises for the safe operation of gas equipment. Further in the article we will reveal the main stages of connecting gas to an apartment, and tell you how to properly prepare your home for the upcoming gasification.

Procedure for connecting to the gas pipeline

If in a private house the owner independently decides on the need to ensure gasification of the real estate, then in an apartment building the consent of each apartment owner will be required to carry out the procedure. Only after this can the next stages of the project begin.

Placing a gas boiler in the kitchen
Depending on the number of gas appliances used inside the apartment, technical conditions are calculated for each object individually

First of all, the future gas consumer will need to draw up a package of legal documentation, including ownership of the apartment, as well as a document confirming the residents’ consent to connect the entire house to the central gas pipeline.

This is a prerequisite, since without the listed documents the homeowner will not be able to obtain technical conditions.

Next, the home owner will need to enter into an agreement with the gas distribution company and submit an application for obtaining technical specifications for gas connection. This document confirms the possibility of including a new user in the gas system.

The next stage is preparing the premises for subsequent gas connection, which includes carrying out repair work in the apartment. In this case, you will need to fulfill at least the minimum requirements put forward by the gas service.

After all repairs and installation work have been completed, the homeowner will need to call a fireman to ventilation duct checks and drawing up an act. If all requirements are met and safety rules are fully observed, the specialist issues a corresponding report.

Conclusion of a contract for gasification
If all documents are in order, then the apartment owner can safely enter into an agreement with the gas company for the purchase of gas and maintenance of the gas supply system

At the next stage, gas is connected to the apartment in the new building, but this is only possible after 50% of the residents of the new building have successfully completed all of the above stages. In addition, at the time the property is connected to the central gas pipeline, all owners must remain in their apartments.

Technical conditions for gas connection

These requirements are calculated for the safest use of gas equipment, therefore, compliance with technical conditions is a mandatory step for all consumers.

The document contains all the necessary conditions and requirements for the design of the gas pipeline, including its installation parts, as well as for the chemical composition and technical parameters of the fuel.

Correct implementation of technical conditions
Drawing up a project for a connected system necessary for the construction of a gas pipeline is impossible without obtaining and further fulfilling technical specifications

Different consumers can use gas for completely different purposes, for example, a gas stove is enough for someone to ensure maximum comfort, while another resident of an apartment building plans install a geyser and additional underfloor heating. In this case, technical conditions for each consumer will be drawn up individually.

This stage of gas supply in apartment buildings also includes gas meter installation, without which the inspector will not be able to draw up an act. If at least one of the established conditions is not met, the inspection is postponed to another date, by which the property owner must fulfill all requirements.

If the requirements are not met properly, the gas company reserves the right to refuse gasification of a particular apartment.

Thus, gas equipment is equipped with special plugs, while the object can be connected to gas only if the owner of the property fulfills all the requirements in accordance with the norms of the document SP 42-101-2003 “General provisions for the design and construction of gas distribution systems made of metal and polyethylene pipes”.

Verification of requirements
The validity period of the fire act is only 1 month, during which technical supervision workers must connect the gas

The technical specifications are drawn up by the gas distribution company, which is obliged to provide the homeowner with the relevant document within 14 days after submitting the application. After checking the fulfilled requirements, it is better to order the project from the company recommended by the gas company, since this is the only way to speed up the gas connection process.

When is the connection made?

Gas start-up is carried out only if the owner of the apartment in an apartment building has completed all established stages, including repair of the premises and conclusion of an agreement with the gas supply company.

An important condition is to undergo scheduled training that covers all the most important points for the safe use of gas equipment.

Inspection of indoor gas equipment
Gas connection is made only if at least 50% of the residents of the apartment building have met all the established requirements

If homeowners are determined with an exact date, then gas company specialists will be able to carry out pressure testing of gas networks in apartments that belong to the same riser. To do this, workers will need access to each apartment, otherwise the pressure testing will have to be postponed to another date.

This is the most important condition before directly connecting the facility to the central gas pipeline, since it is often at this stage that gas leaks are detected.

If a malfunction is detected in the operation of gas equipment, gas service workers will carry out all necessary work to eliminate it. After successful pressure testing, residents of the apartment building will be informed of the gas start-up date. On this day, all apartment owners must also be at home to ensure access to indoor gas equipment.

Basic rules for gasification in an apartment

In the process of drawing up individual technical conditions, the purposes of gas use by the apartment owner are taken into account, including the number of gas appliances to be installed. It is on the basis of this information that a list of requirements is compiled.

Checking equipment before connecting gas
GorGaz employees do not always include mandatory rules for installing gas equipment in the technical conditions, therefore, due to their failure to comply, the EMERCOM employee will be forced to postpone the gas connection date

You can familiarize yourself with the established rules for installing gas equipment inside an apartment in the document SP 42-101-2003 “General provisions for the design and construction of gas distribution systems made of metal and polyethylene pipes.”

According to the document, there are a number of minimum requirements established for all gas consumers:

  • painting the gas pipe white;
  • ensuring sealing of the chimney installation site using cement mortar;
  • installing a grille on the ventilation duct;
  • installation of a kitchen door with a 3 cm undercut from the floor, and installation of a decorative grille at a distance of 10 cm from the floor;
  • installation of electrical sockets next to the boiler, and a signaling device located near the gas meter;
  • purchasing a voltage stabilizer for the boiler;
  • mandatory purchase of a gas stove before the inspection by the inspector;
  • connection of gas-using equipment using stainless steel hoses no longer than 1.5 m;
  • purchase of a gas stove equipped with a gas control system;
  • availability of all necessary technical documentation for the gas equipment used.

Failure of gas-using equipment to meet basic technical requirements is already grounds for refusal to conclude an agreement by the gas supply service.

In order not to slow down the process of connecting gas in the apartment, it is important to fulfill all the established requirements in advance, and only after that call a specialist to carry out an inspection.

Gas sensor installation example
For all residents of an apartment building, the installation of indoor gas monitoring sensors is mandatory from June 6, 2019

Another mandatory condition is the installation of “easily removable” glass in the kitchen of a residential building, while in an apartment building you will also need to install gas sensors.

Of course, such devices will require additional costs, but this will ensure safety not only for the owner of the apartment, but also for the residents of the entire apartment building.

Conclusions and useful video on the topic

You can learn about the unexpected difficulties of connecting gas in an apartment from the following video:

The procedure for connecting gas to an apartment consists of several important steps, failure to complete which will result in gas company employees refusing to carry out gasification. Even if the homeowner has fulfilled all the technical conditions established by the company and entered into an agreement with the gas supply company, the gas connection process may be suspended.

To successfully check gas equipment and subsequently connect gas, all residents of an apartment building must be at home to ensure access to each apartment. At the final stage, it is important for all residents of the house to cooperate, which will allow the gas workers to successfully connect gas to the residential building.

If you have already gone through all the stages of connecting gas in an apartment, you can share your experience in the comments below the article. Tell our readers what difficulties you encountered in the process of cooperation with a gas company, and what mistakes you had to correct when meeting technical requirements.

Visitor comments
  1. Galina

    We have 12 sq. the house is brick, all the documents have been prepared, but it is not clear why we should pay our administration 18,600 rubles. from each apartment. We paid the same amount to the gas service divided among everyone for technical conditions. What does the administration have to do with it?

    • Administration

      Hello. The administration has nothing to do with maintenance or gas lines; there is no point in paying them.

      • Alexander

        They said the Aton boiler cannot be installed in the apartment

    • Raphael

      Where should the money come from for Muller’s salary of 5 million per shift?
      Have you just arrived in Russia?

  2. Irina

    Good morning. Who should pay for commissioning work for individual gas supply to an apartment in an apartment building?

  3. Arman

    The management company sent a letter with a complaint that because of me, our apartment building was not connected to gas on time, for reconnection to gas, which happened successfully, they demand money from me, since it was because of me that they didn’t connect it the first time, but when they connected gas for the first time I was not aware of this and, moreover, was not instructed

  4. Elvira

    5 years ago our village was gasified. Several five-story buildings. We want to buy an apartment that at one time refused gas. They are heated by electricity. We want to install gas equipment. We can’t find anyone who can help us with this issue: the gas workers are sent to the village veterinarians, who, in turn, are sent to the gas workers‍♀️

  5. Inna

    Hello) we are faced with connecting gas through a riser -9 kV (the whole house has gas connected, except for us). Two apartments have written a refusal of gas and installed electric stoves. Do we have the right to connect gas? And what percentage of refusals is possible when connecting gas? Thank you

  6. Anna

    Hello. Maybe someone can tell me. bought an apartment, the developer asks to chip in for gas installation for 120 thousand. He said whoever doesn’t chip in will cut off the gas supply to those in the quarter and then supplying gas to a separate quarter will cost more. is this really true? or then you can go to Gorgaz yourself and conduct it separately for the same price...

  7. Julia

    Hello!!!
    In my one-room apartment to the gas pipe (in the kitchen) through a splitter and two special ones. Stainless steel hoses are connected to a separate gas stove and a free-standing oven (all equipment is built into the kitchen furniture), this equipment is in good working order and for 10 years has not caused any complaints from inspectors either in operation or installation.Yesterday the gas man came for his annual inspection. And he said that in 2021, due to the increasing frequency of fires, new requirements have appeared for connecting gas-using equipment - only one gas-using equipment can be connected to one pipe, and therefore I need to replace the existing equipment with one stove that also has gas burners and oven.

    • Yana

      Hello! Please tell me! I live in a village, we bought an apartment in an apartment building, half of the house has gas, they don’t give it to others, even though I have gas piped into the house, the gas stove has a connection to the boiler, but they won’t let me switch to gas heating, housing and communal services won’t give approval

  8. Anonymous

    Hello, what a difficult job it is to connect a high-rise building to natural gas! Is it true that technical specifications have an expiration date, and where can I find the truth about the cost of installing a gas analyzer?

  9. Tatiana

    Hello, it’s not an easy job to connect a high-rise building to natural gas! Please tell me, do the technical specifications have an expiration date and what is the real cost of installing a gas analyzer?

  10. Hope

    Hello, tell me what to do. Our village is included in gasification. We live in a three-apartment house, essentially a private house, but they refuse to connect us to gas; they demand documents for the land, which is not included in the apartments. What to do???

  11. Anna

    Hello. Help me to understand.We bought an apartment in a new building with apartment heating. According to our riser, we alone paid for the gas supply. The rest do not want to and say they are not going to do the repairs yet. I'm going to come live with the children. I need gas and, accordingly, hot water. The Criminal Code is not going to do anything. What should I do to hurry them up?

  12. Pitsukov Yuri Vladimirovich

    Hello, tell me what to do. Our village is included in gasification. We live in a two-flat house, essentially a private house, but they refuse to connect us to gas; they demand documents for the land, which is not allowed for apartments. What to do???

  13. Nina

    Hello. Our village has been gasified for ten years now. I live in an apartment building. We have been trying to connect gas for five years now. Gazprom demands more than a million for technological connection. Is it possible to connect for free? All owners have consent.

  14. Valentina

    Our 10-storey building has gas installed, it was also installed in our apartment, but the former owner used an electric stove since he was practically on the road. We bought this apartment, how to connect a gas stove, what documents are needed

  15. Elena

    Hello! This is not an easy task: collecting documents for gas supply). The inheritance was an apartment with heating from AGV (which did not exist, as well as a gas pipe, it was cut off for debts).We danced for 1.5 years with papers) Payment of the debt, technical conditions, technical passport (it’s paid), project (paid), restoration of the gas pipe (paid, this was the first and wrong step), approval of the project in technical supervision then with the house management company (paid) , isolation of the ventilation duct (for a fee), holding a meeting (this was the most difficult thing, the building had apartments owned by the administration), coordination with the administration (obtaining permission for redevelopment (installation of a wall-mounted gas double-circuit boiler)), installing a boiler (for a fee), obtaining permission from technical supervision about readiness for connection, a contract for VDGO (for a fee), a contract for gas supply, again technical supervision (for a fee) and waiting for that very start-up (connection).
    All this is in different places around the city (district), and a number of documents have a limited time in action (according to the fire safety report, I had to apply again and this is + a month and for a fee).

Add a comment

Heating

Ventilation